Cell-phone/Whatsapp: +86-156 1007 5118        terry@xgzbuildings.com   +86-15610075118

Commercial Building

Product Category

Keep In Touch With Us

Keep In Touch With Us

Share to:

Steel Structure Office Buildings

Steel Structure Office Buildings
Availability:
Quantity:
 

The construction of steel structure office buildings seems to be an inevitable trend. The steel structure office buildings is assembled from various components. What problems should be paid attention to when building the office buildings to ensure the quality and stability of the office buildings?

 

(1) It is not recommended to use hollow steel such as square steel, pipe steel, etc., because it is difficult to paint anti-rust paint inside the steel, cold and heat changes in the north, and the rust of the steel condensed water will pollute the ceiling and wall, and seriously endanger safety.

 

(2) The force of the steel structure layout must be clear, and the force transmission route must be clear and concise. Because the steel structure itself has obvious force and vibration, it is necessary to accurately analyze and calculate, strictly control the structural deformation and vibration frequency, ensure the visual beauty of the structure, eliminate the resonance of the structure and human activities, and avoid the shear fatigue damage of the structure due to resonance. At the same time, it can guarantee the comfort during use.

 

(3) For the purchase of profiles, generally we have a variety of specifications to choose from. No matter which specification you choose, it is recommended to use "national standard" steel because its steel quality and specifications are better than "non-standard steel". Non-standard steel has high hardness, brittle steel, poor ductility, and is not easy to cut or drill.

 

(4) Before fixing the channel steel, the side of the channel steel against the wall should be painted with anti-rust paint, but the other parts should be painted after the welding is completed, otherwise it will affect the welding work.

 

(5) When installing the steel structure, note that the I-beam and channel steel must be of the same specification, and must choose "full welding". The main keel should be whole steel, and intermediate welding is strictly prohibited.

-2

FAQ:

1. Is your price competitive compared with other companies?
Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.

2. Can you send engineers or whole team to install my project?
We will give detailed installation drawings and video for free. We can send engineers as installation director or a team upon request.

3. Do you accept container loading inspection?
You are welcomed to send an inspector, not only for the container loading, but any time during the production time.

4. Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. we can design complex industrial building like office mansion, super marker, auto dealer shop, shipping mall, 5 star hotel.

5. What is the delivery time?
Delivery time depends on order quantities. In general the delivery time to nearest seaport in China will be 30 days after receiving deposit.

6. How can you get a quotation for your projects?
You can contact us by email, phone, Alibaba TM, WhatsApp, Skype, Viber and so on 24*7 and you will get reply within 8 hours.

 

 
Qingdao Omiga Construction Engineering Co.,Ltd.

CONTACT US

    Terry Lee
   terry@xgzbuildings.com
   +86-156 1007 5118
   +86-156 1007 5118
   +86-15610075118
   No.17, Changjiang Road, Pingdu, Qingdao,Shandong Provience,China
​Copyright © 2022 Qingdao Omiga Construction Engineering Co.,Ltd. . All rights reserved